Application brief
This reference places main ducts, branches and round diffusers around an atrium service zone. Coordinate airflow direction, structure, lighting and access with the architectural layout. Final routing and terminal selection follow the approved project drawings.
Selection checkpoints
Material matched to the duty
Choose materials and finishes for the air conditions and environment. Grade and thickness follow the agreed project schedule.
Connections that fit the site
Check connection details, available installation space and access requirements before confirming the supply list.
Drawing-based selection
Share drawings, dimensions and quantities to align construction, interfaces and the required accessories.
Case images and layouts are illustrative references; final details follow approved project drawings.
Back to cases →