Application brief
This example illustrates general ventilation ductwork in a workshop setting. Define air conditions, extraction duty and equipment interfaces before choosing materials and routes. Connection positions, access routes and duct interfaces are coordinated with the equipment layout.
Selection checkpoints
Material matched to the duty
Choose materials and finishes for the air conditions and environment. Grade and thickness follow the agreed project schedule.
Connections that fit the site
Check connection details, available installation space and access requirements before confirming the supply list.
Drawing-based selection
Share drawings, dimensions and quantities to align construction, interfaces and the required accessories.
Case images and layouts are illustrative references; final details follow approved project drawings.
Back to cases →